LED Lighting Retrofit Case Studies
35,000 Sq. Ft. Fabrication Centred Warehouse
In Surrey, BC, a construction company specializing in fabrication, sought to address inefficiencies in their lighting system within their warehouse & manufacturing facility.
280,000 Sq. Ft. Multi-Tenant Industrial Warehouse
In these warehousing units, existing fluorescent hi-bay lighting system presented significant energy inefficiencies and maintenance challenges.
Highlands Parkade - Strataco
This parkade was once lit by obsolete fluorescent linear strip lights, notorious for their inefficacy. In various sections, these fluorescent lights had experienced malfunctions, leading to poorly lit areas. The problematic ballasts had caused frequent maintenance and expensive replacements.
Canada Place - Cruise Ship Terminal
This facility welcomes over 1M visitors annually, can service up to four luxury cruise ships at a time, boasts a high-security immigration level, and efficiently manages the handling of millions of tons of cargo. This complex two year project involved the replacement of over 2600 LED luminaires, all integrated with a state-of-the-art control system.
66,500 Sq Ft - Pet Supply Warehouse & Distribution Centre
This pet supply distribution centre consists of 66,500 sq.ft. of active warehouse space, open docking areas, and office space. Founded in 1977, this company is currently the largest distributor of pet supplies in Western Canada. The facility typically operates Monday – Friday, 15 hours per day.
1 Million Sq Ft - Distribution Hub
This distribution hub is BC’s largest, consisting of three massive buildings totaling over one million sq ft combined. The centre is located in Richmond, B.C., situated on Port of Vancouver Richmond Properties. This busy park often sees heavy amounts of truck and delivery traffic 7 days per week.
268,000 sq ft Multi-Modal Transload Facility & Train Hall
This facility consists of two buildings totaling 268,000 sqft. on a 22.3 acre site which is located on Port Metro Vancouver’s land, in Richmond B.C. The train hall is serviced by CN Rail and the facility contains 154 bay doors. This facility operates 7 days a week for 12 or more hours per day.
7 Building Commercial Business Park
This commercial business park consists of 7 buildings situated on approximately 17 acres of land located in a high traffic location in Richmond, B.C. The commercial buildings are used day and night, often seeing heavy traffic of retail and truck delivery 7 days per week.
690,000 sq ft Distribution & Storage Centre
This distribution & storage center consists of two large buildings totaling over 690,000 sq ft combined. Situated on approximately 27.25 acres of land located in Delta, B.C., this busy park often sees heavy amounts of truck and delivery traffic 7 days per week.
300,000 sq ft Warehouse & Distribution Centre
This massive 300,000 sq ft logistics and distribution center is located in Delta BC. The bustling warehouse typically operates over 16 hours per day 7 days a week.
98,000 sq ft Provincial Logistics & Freight Centre
This distribution warehouse and storage facility consists of 98,000 sq ft. of space; a third party logistics and freight forwarding company based in Delta, BC. This facility manages, stores and transports inventory 24/7, 365 days a year.
120,000 sq ft Pulp Distribution Warehouse
This commercial pulp distribution center consists of 120,000 sqft of active warehouse and storage space. The facility operates for 12 plus hours a day 7 days a week; seeing heavy foot and forklift traffic.
140,000 sq ft National Tire Chain Distribution Centre
This National Tire chain’s distribution facility consists of 140,000 sqft. of active warehouse space. Consisting of open dock areas and racking for storage of tires, this business often operates for more than 16 hours per day 7 days per week, often seeing heavy forklift and truck traffic.
EV Charging Case Studies
Trinity Western University Parking Lot
This private University located in Langley B.C. wanted to install Electric Vehicle charging stations in their brand-new parking lot.
16111 Blundell Rd Business Park
This multi-unit warehouse & business park were excited to adopt Flo Level 2 chargers. They also wanted to optimize their charge stations to ‘pay-for-use’ and wireless monitoring.
District of North Vancouver Operations Centre
Located at the heart of their busy Operations Center, there was a need to install Electric Vehicle charging stations for the District’s staff usage covering the 161 square kilometer area.